How Long Does It Take To Install Kitchen Cabinets? (Find Out Now!)

Heather Robbins
by Heather Robbins

Demolition usually takes a day or two to remove everything for a full-on kitchen makeover. This makes it significantly less intrusive. However, it takes much longer for the installation of appliances and hardware. So, what about kitchen cabinets? How long does it take to install them?

It can take between one to two days to install kitchen cabinets, as long as you know what you are doing. The time it takes depends on the size of the cabinets as well as if they are a specialty product. You may need to install new hardware to accompany your new cabinets.

In this article, we will talk about the amount of time it takes to install new kitchen cabinets, as well as some of the factors you should take into account when beginning your endeavor. Let’s get started!

Do You Need to Hire Cabinet Installers?

Get free, zero-commitment quotes from pro contractors near you.

Things That Influence The Amount Of Time

It’s crucial to keep in mind, though, that the timeline for your kitchen redesign might be influenced by a variety of circumstances. These are some of them:

  • Size. The larger the kitchen, the longer it will take to redesign.
  • Scope. The number of features in your kitchen that need to be upgraded might also affect how long it takes to renovate your kitchen.
  • Specialty Products. When a client requests a particular item, it’s always exciting since these pieces can add a lot of individuality to a room. It’s crucial to keep in mind, though, that specialty things can take longer to obtain. Custom-made doors, unusual countertops, and exclusive tiles are just a few examples of specialty items.
  • Requests for changes. Changes to the final design of your kitchen renovation will almost always cause a delay. Why? Because revisions frequently necessitate reworking the final design, erasing previously performed work, and ordering new materials.

Planning & Designing Your Kitchen Cabinets

While the plan and design phase isn’t included in our six- to eight-week estimate, it is an essential element of the process. You should have a clear image of what a remodeler will be doing before they begin any project.

This is the time when you choose your cabinets and countertops. Now is the time for you and your designer to discuss your needs, the features that are available, and which ones will help you make your room as useful and beautiful as possible.

Related Guide: Custom vs. Prefab Cabinets: What Are The Major Differences?

Selecting Your Kitchen Cabinet Materials & Products

As previously said, the materials and products you choose can have a big impact on the timeline for your kitchen remodel. Custom cabinetry and one-of-a-kind items can take a long time to come by.

It’s also a good idea to select the exact slab you want if you’re going with natural stone for your countertops. This entails someone (you, your designer, or both of you) personally visiting the dealer and inspecting several stone slabs.

What is the significance of this? Because there are a variety of patterns and colors to choose from. Some are subtle, while others are more dramatic. And you want to be sure that the modifications you make are ones that you’ll enjoy for years to come.

Removal

It usually takes two days to remove your old cabinetry and countertops. However, depending on the scale of the project, this schedule may alter. This can delay your removal period if the floor needs to be removed or specialty parts need to be protected.

Marking Electrical Outlets

Most construction staff precisely labels all of the electrical outlets before we begin work. This includes not only light fixtures and appliances but also wall outlets.

Build And Install

The build and install phase is when you begin the build and installation procedure when the electrical work has been marked. This is typically when any crews or you update any electrical wiring that has to be added or updated at this time. In addition, we make any necessary repairs to the plumbing.

Priming

This is when you start priming your kitchen when all of the electrical and plumbing has passed inspection. This includes drywalling and floor installation.

You’ll want to ensure that all of the prior installations, as well as the project surface entirely, are all primed and ready to go. This means any wall-painting or hardware changes before the cabinet installation takes place.

Cabinet Installation

This is when the kitchen begins to resemble a kitchen once more. The kitchen begins to take shape as the construction crew begins to install the cabinets. Or, of course, if you’re doing this on your own which is a very DIY-friendly project.

Touch-up & Cleaning

We place a high value on cleanliness. Our crew completely cleans the job site at the end of each project and performs any necessary touch-up work.

This can take several hours depending on how much work you had to do, as well as how large the surface area is of which you had to do the work.

Do You Need to Hire Cabinet Installers?

Get free, zero-commitment quotes from pro contractors near you.


Related Questions

Is it hard to install kitchen cabinets?
The job of installing kitchen cabinets can seem a bit overwhelming for sure, but it’s actually a pretty easy venture, and it only takes the basic tools you have laying around your home. If this is something you don’t want to do yourself, you can always hire someone to do the job for you.
How much does it cost to assemble and install kitchen cabinets?
You can expect your kitchen cabinet installation to cost you between $150 and $500 for each cabinet, and this includes labor. Or, if you’re looking at this on a linear foot basis, you can expect to spend between $150 and $380 per linear foot for the total cost.
How much does it cost to install cabinets per linear foot?
If you’re wanting to estimate your project on a per linear foot basis, you can expect to pay between $150 and $380 per linear foot for the entire installation cost.
It will take approximately 60 minutes to 90 minutes per cabinet. If you’re hiring someone, expect to pay around 1 to 2 hours of labor for each cabinet that you are having installed.

Related Guide

Heather Robbins
Heather Robbins

Heather is a passionate writer who loves anything DIY. Growing up, she learned everything from home repairs to design, and wants to share her tips with you. When she's not writing, she's usually hiking or searching for her next DIY project.

More by Heather Robbins

Next